To develop analysis and design techniques for well testing, we must make several simplifying assumptions about the well and reservoir being modeled.These assumptions are introduced as needed to combine().


To develop analysis and design techniques for well testing, we must make several simplifying assumptions about the well and reservoir being modeled.These assumptions are introduced as needed to combine().

A.the principle of mass conservation

B.an equation of fluid motion

C.an equation of state

D.an equation of well testing

正确答案:the principle of mass conservation;an equation of fluid motion;an equation of state


Tag:气藏工程 时间:2024-01-06 14:53:20