Railway construction moved ahead very swiftly, on the basis of a mixture of central and local funding from the beginning of the 1990s.
Railway construction moved ahead very swiftly, on the basis of a mixture of central and local funding from the beginning of the 1990s.
A.正确
B.错误
正确答案:正确
Tag:中外铁路文化之旅
时间:2022-01-14 21:30:00