Earth Movers & Shakers operates 3 iron ore mines. The table below shows each mine’s total daily production and the current number of miners at each mine. All miners work for the same wage, and each miner in any given mine produces the same number of t
Earth Movers & Shakers operates 3 iron ore mines. The table below shows each mine’s total daily production and the current number of miners at each mine. All miners work for the same wage, and each miner in any given mine produces the same number of tons per day as every other miner in that mine. The opportunity cost of moving one miner from Middle Drift to another mine is:
A.1 ton per day.
B.3 tons per day.
C.5 tons per day.
D.4 tons per day.
正确答案:5 tons per day.
Tag:微观经济学 中国大学MOOC微观经济学
时间:2021-12-11 14:25:54
- 上一篇:Earth Movers & Shakers operates 3 iron ore mines. The table below shows each mine’s total daily production and the current number of miners at each mine. All miners work for the same wage, and each miner in any given mine produces the same number of t
- 下一篇:Refer to the figure below. If this restaurant makes 75 salads in one hour, then what’s the maximum number of pizzas it can make in that same hour?